TECPRO has been actively involved in the construction of various cross country pipeline projects in the areas of oil, gas and water throughout the country.

 

for transporting of Petrol, Diesel, Naphtha, Kerosene & Crude Oil



v 23 KM long 10" pipeline from Jawaharlal Nehru Port Trust (JNPT) to Vashi,Mumbai
v

18.5 km long 600mm dia twin carbon steel pipeline for transportation of petroleum products (naphtha, petrol and diesel) between Oil Jetty, Cochin and Oil Installation of Bharat Petroleum Corporation Ltd., at Irumpanam, Cochin.

v

19 km long 200mm dia carbon steel naphtha pipeline for Indian Oil Corporation Ltd., from IOC’s Irumpanam Terminal to new ammonia plant of FACT, Udyogamandal, Cochin, crossing 4 major rivers.

v
9 km long 500 mm dia cross-country naphtha pipeline from transfer pit to Bharat Petroleum Corporation Ltd. complex at Kakkinada, Andhra Pradesh.
v
6 km long 400 mm dia cross country naphtha pipeline from railway siding, Cheppad to thermal power plant of NPTC at Kayamkulam for Bharat Petroleum Corporation Ltd.
v
1.5 km long 350 mm dia aviation fuel supply for the fuel hydrant system at International Airport, Cochin for Bharat Petroleum Corporation Ltd.
v
8.0 km long, 600mm dia tanker discharge pipeline at Visakhapatanam for Hindustan Petroleum Corporation Ltd.
v

0.95 km long, 600 mm dia carbon steel pipeline between BPCL installation and IOCL installation, Irumpanam, Cochin.

for transporting natural gas (CNG) and liquefied petroleum gas (LNG)

v

9.5 km long 200mm dia natural gas pipeline from ONGC’s GCS at Sursanayanam to Tap-in-point at Gudala for Gas Authority of India Limited at Amalapuram, including cathodic protection system, crossing 4 major river creeks.


v

7 km long 200 mm dia natural gas pipeline from TAP OFF to Spectrum Power Plant at Kakkinada for Gas Authority of India Limited, including cathodic protection system.

v
16.5 km long 150 mm / 200 mm / 250 mm dia natural gas pipeline along with station piping from Adavipalam to Tatipaka in Andhra Pradesh for Gas Authority of India Ltd., including one major creek crossing and cathodic protection system.
v
Construction, laying of 8” dia and 10” dia for 15 kms long Gas Pipeline from Adavipalam to Tatipaka along with Scrapper Stations, Cathodic Protection, Creek crossing etc., for M/s. Gas Authority of India Ltd.
v Laying, Testing & Commissioning of 12” dia & 4” dia spur lines Carbon Steel Pipelines from Matunga to Saat Rasta, comprising of Spread B & C in Mumbai City for Mahanagar Gas Ltd., Mumbai.
v Laying of 12” CS Underground pipeline and associated jobs of Spread ‘F’ in Mumbai City for Mahanagar Gas Ltd, Mumbai

for conveying drinking water & raw water.

v

35 km. long 1800 mm dia cement coated steel pipeline for transportation of fresh water from Cauvery River to Bangalore city under Cauvery Water Scheme Stage III for Bangalore Water Supply and Sewerage Board, Bangalore. Scope included construction of valve houses and associated civil works.

v

8 km. long 500 mm dia and 4 km 150 mm dia make up water system from Achankovil river to power plant of National Thermal Power Corporation Ltd., Kayamkulam. Scope included erection of 3 Nos. of vertical turbine pumps of 750 Cu.m/hour, electrical instrumentation works, application of pipe coating material, railway / road crossings and other associated civil works.

v
Construction water facilities for bauxite mines at National Aluminium Company ltd., Damanjodi, Orissa. Scope involved civil and structural works for pump house, substation, reservoirs, concrete pedestals, underground and aboveground pipelines, erection of pumps and motors etc. Pipeline was laid through hilly terrain without proper approach road.
 
v
7.2 km long 250mm dia aboveground and underground yard pipeline for
NALCO at Damanjodi, Orissa.
 
v
12.5 km long 500 mm dia over concrete pedestals cross country pipeline of permanent water supply system for NALCO at Damanjodi, Orissa.
   
v
2.8 km. long 400 mm and 300 mm dia above ground twin pipeline to carry red mud reclamation water and ash slurry from the plant at NALCO, Damanjodi, Orissa. Scope included installation of pumps with accessories, fabrication and erection of rack pipe sleepers, substation etc. for red mud, effluent, ash disposal and water reclamation system.
   
v
1.6 km. 700 mm dia underground pipeline for carrying the reclaimed water from exit tunnel to junction point for Kudremukh Iron Ore Company ltd., Kudremukh.
   
v
Design, procurement, supply, erection, installation, construction, testing and commissioning of raw water supply system including laying 6” dia, 13.5 kms long underground pipeline with supply & application of coating & wrapping, ground level reservoir, supply, fabrication and installation of floating barge, pontoon & walkways, supply, installation of complete electrical & instrumentation works for Khera Compressor Station for GREP (HBJ) of M/s. Gas Authority of India Limited on turnkey basis.
   
Recently completed cross country pipeline projects
Fabrication and laying of 750 NB & 400 NB cross-country pipelines for Single Point Mooring (SPM) for Bharat Petroleum Corporation Ltd. (Kochi Refinery), carrying crude oil from Shore Tank Farm of BPCL (KR). at Puthuvypeen to the BPCL (KR) Refinery, crossing City of Cochin, including underground boring of Ernakulam railway line. Project cost is Rs. 1067 lakhs. 
v Total length of the pipeline : 6400 M 
v Consultant : Fact Engineering & Design Organisation, Kochi & Intec Asia Pacific SDB BHD, Malaysia.
v Third Party Inspection: Germaisher Lloyd Industrial Service India Pvt. Ltd.
   
   
   
   
                       ( BPCL (Kochi Refinery) Oil pipeline)          (Jack & Push railway crossing)

Fabrication and laying of 150 NB cross country pipeline from BPCL-KR to HPCL - LPG bottling plant, Cochin:

v Total length of the pipeline : 3250 M 
v Consultant : Fact Engineering & Design Organisation, Kochi  

HDD Pipeline for BPCL-SPM Project, Cochin

v Installation of 750mm dia pipeline by HDD (Horizontal Directional Drilling) method in backwaters of Cochin in 4 stretches from Single Point Mooring system to BPCL-Kochi Refinery.  
v Total length of the pipeline : 4200 M
v

Consultant : Fact Engineering & Design Organisation, Kochi

 

 

   
   
 
[BPCL (Kochi Refinery) Oil pipeline – HDD stringing work]